Skip to main content
Flowcore Field Guide

55 topics written

Topic map

Guided path

Start from scratch

A working lifecycle program: consented list, authenticated domain, welcome and recovery flows live.

For you if

  • You have a store and no flows live, or a Klaviyo account you never finished setting up
  • You want the foundations built in the right order, not a list of tactics
  • You can give this about a working day, in pieces
9 stopsAbout a day, in piecesFoundation

0 of 9 done

Stops

  1. 1
    1.1

    How lifecycle revenue actually works: flows, campaigns, and the split between them

    Calculate your flow and campaign revenue split, check its reliability and choose the next diagnostic task.

    Foundation

    Done when: You have recorded comparable flow revenue, campaign revenue and their shares, with dates and settings, and chosen 1.2 Pull your baseline, 3.1 The flow map or...

  2. 2
    1.7

    Email vs SMS: What Each Channel Is For, What It Costs, and Where Consent Differs

    Decide whether SMS earns a place next quarter, with a clear message job, cost limit and consent checks.

    Foundation

    Done when: You have decided whether SMS is on or off for the next quarter. If on, your consent language and quiet hours settings are written down, with an owner and spe...

  3. 3
    2.1

    Signup forms that convert without annoying people: offer, timing, triggers, mobile, fields

    Build one signup form with a clear promise, sensible targeting and a measurement plan that follows subscribers through to their first order.

    Foundation

    Done when: Stage 1, launch accepted: after the welcome series is live, one form is live with documented targeting and dismissal rules, a test signup receives the promis...

  4. 4
    2.2

    The welcome offer decision: discount, gift, or nothing, and the margin math

    Choose one welcome offer you can afford, check the combined discount and write matching terms for the signup form and first email.

    Foundation

    Done when: you have chosen one welcome offer, checked it against your margin and actual combination rules, and written the exact wording that will appear on the form an...

  5. 5
    1.4

    The data you need flowing: events, properties, integrations, and how to check them

    Verify your store events and channel consent on a test profile before building behaviour-triggered flows.

    Foundation

    Done when: Your test profile shows Active on Site, Viewed Product, Added to Cart, Started Checkout (your integration's checkout metric), Placed Order and, after genuine...

  6. 6
    8.1

    Deliverability fundamentals: authentication, reputation, and the bulk-sender rules

    Authenticate your sending domain, start with an engaged audience and test inbox delivery before expanding your email sends.

    Foundation

    Done when: your authentication records are verified in Klaviyo's domain setup, the dedicated branded domain is live, received headers pass SPF, DKIM and DMARC, and a se...

  7. 7
    3.1

    The flow map: which flows exist, the job of each, and the order to build them

    List your live and missing flows, check their dependencies, and choose the next one to build.

    Foundation

    Done when: You have listed which of the nine core flows are live, missing or inapplicable, with dependencies, owners and last tests. Choose the next build or repair and...

  8. 8
    3.2

    Welcome series (email and SMS)

    Build and test a welcome series that delivers the signup promise, answers buying questions, and stops first-order messages after purchase.

    Foundation

    Done when: The email flow is live, a test profile received the sequence in order, one-time entry passed resubscription testing, and a purchase mid-sequence caused remai...

  9. 9
    3.3

    Abandoned cart vs abandoned checkout: two flows, two triggers, no collisions

    Separate cart and checkout recovery with distinct triggers and collision checks.

    Foundation

    Done when: both applicable flows are live, the three profiles pass, no tested profile receives both flows within 24 hours, purchases stop later recovery sends, and an o...

Optional stops

  1. 1
    3.5

    Post-purchase: first use, the second order, and the review request

    Build a post-purchase sequence that helps customers use their order, gives them a reason to return, and asks for a review at the right time.

    Foundation

    Done when: Your message map gives each job one owner, controlled profiles prove branch routing and exclusions, first-use help follows the delivery plan, and the review...

  2. 2
    4.3

    One email, one job: the campaign brief

    Write one campaign brief with a clear audience, promise, proof and destination before anyone starts designing.

    Foundation

    Done when: you have written one complete campaign brief, recorded the email's exact single primary link, and checked that every proposed content block supports its stat...

  3. 3
    5.1

    Subject lines and preview text

    Write subject and preview pairs that make an honest promise to the right reader, then choose a useful measure for testing them.

    Foundation

    Done when: You have written the next three campaigns’ subjects and previews using the pattern table, recorded each email’s job, checked the promises against the body, a...

  4. 4
    7.1

    Metrics that matter, metrics that lie: opens, clicks, attribution windows, revenue per recipient

    Choose four operating measures, record attribution settings and read campaign results without confusing platform credit with growth.

    Foundation

    Done when: Your attribution settings are recorded and the four operating measures are added to your baseline worksheet with definitions, denominators and observation da...

When you finish

Keep improving with the Improve an existing program path. →

Return to the explorer to find the next topic your program needs. →