Topic map
Guided path
Run the channel with a small team
A monthly rhythm one or two people can keep: cadence, briefs, QA and review.
For you if
- You are the whole email team, or nearly
- Campaigns ship late or without a check
- You want a routine, not more tools
0 of 9 done
Stops
- 11.1
How lifecycle revenue actually works: flows, campaigns, and the split between them
Calculate your flow and campaign revenue split, check its reliability and choose the next diagnostic task.
FoundationDone when: You have recorded comparable flow revenue, campaign revenue and their shares, with dates and settings, and chosen 1.2 Pull your baseline, 3.1 The flow map or...
- 21.2
Pull your baseline: the numbers to know before you change anything
Record a dated baseline of audience health, capture, revenue and repeat purchasing before choosing what to change.
FoundationDone when: Your worksheet is filled with values, definitions and pull dates, with unavailable measurements explicitly explained and assigned a retest date. Save the exp...
- 31.3
Decide what to work on first: the lifecycle audit
Find harmful sends, close foundational gaps, and choose the next lifecycle improvement with a clear reason.
FoundationDone when: You have recorded the confirmed gaps in priority order, even if there are fewer than three or none, and labelled any unverified items “investigate”. For a fi...
- 41.5
Core segments: engagement tiers and customer status
Build eight core segments, record their counts and apply exclusions before choosing a campaign audience.
FoundationDone when: All eight core segments exist, their counts and dates are written down, and profile checks confirm the conditions and consent boundary. Zero counts are valid...
- 53.1
The flow map: which flows exist, the job of each, and the order to build them
List your live and missing flows, check their dependencies, and choose the next one to build.
FoundationDone when: You have listed which of the nine core flows are live, missing or inapplicable, with dependencies, owners and last tests. Choose the next build or repair and...
- 64.1
How many campaigns to send: cadence, fatigue, and list health
Plan next month’s campaign cadence by segment, then use four signals to decide whether to add or remove a send.
FoundationDone when: You have a written cadence for next month by segment, an add/remove rule, and all four signals included in your monthly review.
- 74.3
One email, one job: the campaign brief
Write one campaign brief with a clear audience, promise, proof and destination before anyone starts designing.
FoundationDone when: you have written one complete campaign brief, recorded the email's exact single primary link, and checked that every proposed content block supports its stat...
- 88.4
Pre-send QA: links, codes, mobile, images-off, rendering, expiry
Use a pre-send checklist for mobile rendering, links, codes, images-off, and expired countdowns.
FoundationDone when: Your next send is ready to release: all pre-send checks pass, blocking failures are resolved, Gmail and Outlook seed screenshots and test receipts match the...
- 97.5
The monthly review for a team of one
Run a monthly review with a short list of reports, comparisons, and decisions.
IntermediateDone when: You have saved a dated review note with the comparison basis, three decisions, their owners and check dates, and next month's segment-level cadence plan. Nam...
Optional stops
- 15.6
The writer-to-designer brief
Give the designer ordered copy, assets and destinations, then check the returned email against the same brief.
IntermediateDone when: one completed brief contains the approved blocks, assets, proof, terms and destinations or an explicit no-link exception, and the returned phone-width and im...
- 28.5
Account organisation: naming, versioning, tags, and handover
Make your account easy to take over with clear names, a change log, controlled access and a tested handover.
IntermediateDone when: Another authorised person can find an active flow, its owner, a campaign audience, the latest change and the next approved send without your explanation. The...
- 34.4
Planning the calendar: month, quarter, and the Q4 runway
Build next month’s campaign grid from audience needs, commercial priorities and the work your team can finish.
IntermediateDone when: Next month's grid is filled and shared, every send has an audience, job, brief and owner, no-send decisions are explicit, and production, repair work and the...
- 45.5
An email design system: templates, modules, mobile, images-off, accessibility
Build one reusable email template that saves production time and still works when images are unavailable.
IntermediateDone when: one base template and a library of six available modules are saved, their rules are recorded, and a received test passes phone, dark-mode, images-off and scr...
- 58.7
The small-team stack: Shopify, Klaviyo settings, reviews, subscriptions, and what not to buy
Choose a small-team stack by the jobs it must do, test its connections, and remove costs that do not earn their place.
IntermediateDone when: Every retained app has an owner and necessary job, deferred purchases have a clear reconsideration condition, required events and consent handoffs pass contr...
When you finish
Keep improving with the Improve an existing program path. →
Return to the explorer to find the next topic your program needs. →