Replenishment, back in stock, and price drop
Build reminders around product use, requested restocks and relevant price changes, with clear exclusions and a measurable result.
Answer the customer's timing
A customer can want your product and still have no reason to buy today. The cupboard is full, the right size is unavailable, or the price is more than they want to pay. These are three different obstacles. Sending another general promotion does not necessarily remove any of them.
Your task is to choose which obstacle you can reliably detect, then build the corresponding reminder. Place it within 3.1 The flow map. You do not need all three flows just because templates exist.
Our recommendation is to start with the clearest customer need. A. Relevance comes from the event: running low, requesting a restock, or previously considering an item whose price falls. B. The message can do one useful job: make the next purchase easier. C. A narrow promise is easier to keep: you can check the date, product and destination before sending.
Skip replenishment for durable goods without a plausible replacement cycle. Skip restock alerts when inventory cannot be trusted. Skip price-drop automation when constant promotions already tell the same people the same thing.
Find the replenishment interval in orders
Start with one repeatable product, not the whole store's average order gap. Export customer identifier, order identifier, order date, product or variant, quantity and order status. Remove test and cancelled orders, document how refunds are treated, and combine split records belonging to the same order.
Sort each customer's purchases of that product by date. Subtract each qualifying purchase date from the next one. Keep single-pack and multipack buyers separate; a customer buying three refills probably has a different cupboard from someone buying one. Also separate subscriptions, whose billing schedule can distort voluntary reorder timing.
Look at the median gap and the spread, then inspect actual customer histories around them. Count customers as well as intervals so a few frequent buyers do not quietly determine your schedule. Customers who have not reordered have no completed interval; report their count and observation age rather than treating their gap as zero. Discount stockpiling and seasonal gifts need investigation.
For a hypothetical brand selling a household refill, one customer's orders on July 1 and August 5 are 35 days apart. Other comparable gaps are 28, 34, 36 and 42 days, giving a median of 35. These are order intervals, not proof of the day the bottle empties. Delivery time and how soon people start using it matter.
A starting hypothesis for this example is that a day-32 reminder increases same-product reorders by day 45 without increasing unsubscribes versus no reminder. Test that proposition; do not turn 32 days into a store-wide default. Klaviyo also advises basing replenishment timing on established buying cycles. 1
Choose a date mechanism you can maintain
Klaviyo's replenishment guide uses an order trigger with a delay and product-specific filtering. That is a straightforward option when each new qualifying order should begin a fresh product cycle. 1
For a date-based implementation, our recommendation is to maintain a product-specific next-replenishment date calculated from the last qualifying order plus its observed cycle. This calculation is your data process, not an automatic promise of the date trigger. Assign its owner, update it after another purchase, and test changed or missing dates. Check the underlying fields through 1.4 The data you need flowing.
Klaviyo documents selecting a stored date property and starting on or before it. To send after a date, start on it and add a delay. Its monthly and yearly recurrence choices follow the calendar, not consumption. 2 Do not select monthly merely because a refill usually lasts about a month. Prove the intended next-order update and re-entry behaviour with controlled profiles before launch; use the order-triggered alternative if you cannot maintain it reliably.
Klaviyo Academy separately documents a date-based flow using Expected Date of Next Order, set to never repeat on fixed calendar intervals, with an exclusion for an order since flow entry. 3 Treat this as predicted customer purchase timing, not measured stock remaining for one SKU. If predictive data is unavailable or unsuitable, keep the observed product-cycle route. Do not run both reminders for the same need.
Give replenishment messages distinct jobs
Our recommendation is to begin with a reminder and an easy reorder route in the same email. Name the item, acknowledge uncertainty with “Running low?”, and link to the correct purchasable variant. Do not claim to know what is left at home. Test quantity selection, current price and mobile checkout.
Only add another message when it answers a different question. A subscription offer can explain convenient repeat delivery for a customer with stable use. Keep one-time reorder available and exclude existing subscribers from that pitch. Use 6.3 Subscriptions to assess fit and terms. There is no obligation to add a discount or a third email.
First-use help belongs earlier in 3.5 Post-purchase: first use, the second order, and the review request. Someone who never used the first bottle needs help before another bottle.
Keep the restock promise small
The promise is “Tell me when this item returns,” not “Reserve one for me.” Collect a back-in-stock subscription for the correct item. Klaviyo documents the Subscribed to Back in Stock metric followed immediately by its Back in stock delay, which holds the person until restocking. Its build guide advises one notification, no added time delay, and Smart Sending off for that requested alert. 4
Show the requested product, its availability and one purchase link. Our recommendation is to leave unrelated promotions out. Do not treat the request as permission for every marketing channel.
Klaviyo's minimum-inventory setting controls how much stock must return before notification. Batch settings control recipients per restocked unit and waiting between batches; these settings apply across the account's back-in-stock flows. 4 Choose them with the inventory owner. One returned unit is not a reason to notify an entire queue. Test the requested variant and online availability, especially where store inventory is also synced. An alert still does not guarantee stock will remain until checkout.
Use price drop only for a meaningful change
Klaviyo's Price Drop trigger targets people who viewed an item or started checkout with it when its catalogue price falls by your chosen amount or percentage. The documented lookback defaults to 30 days; that is a platform setting, not a recommended buying window. 5
The flow excludes prior purchasers of the item and does not send for nonpositive inventory or unpublished variants. Custom catalogues require mapped price and inventory, matching event data, and support-enabled access. A checkout coupon alone is not a catalogue price reduction. 5
Our recommendation is one prompt showing the relevant item and its current price. Skip this flow when catalogue data is unreliable, margin cannot support the reduction, or frequent repricing would make the alerts repetitive. Choose the qualifying reduction deliberately and check the destination price before release.
| Flow | Trigger | Messages | Watch |
|---|---|---|---|
| Replenishment | Last product order plus cycle; maintained date or order delay | Reminder and easy reorder; optional subscription explanation | New orders, quantity, active subscriptions |
| Back in stock | Restock subscription, then stock delay | One requested availability alert | Variant, minimum stock, batch rules |
| Price drop | Qualifying catalogue reduction after item interest | One relevant price alert | Eligibility, current price, campaign duplication |
Resolve collisions and measure the result
Write precedence using 3.8 Flow hygiene. Our recommendation is to let an active cart or checkout journey handle current buying intent and suppress a redundant replenishment prompt. For an order-triggered product-specific replenishment flow, add Placed Order zero times since starting this flow, where Items contains the exact product name under Profile filters, using the product dimension and exact value present in your integration. Narrow the trigger to that same product. This filter is checked before every email sends, so a repeat purchase blocks the old reminder. 1 Test a same-product repeat purchase and a different-product order separately. For a maintained-date route, also prove the new purchase updates the next due date before an old reminder can send. Use the concrete event exclusions and per-message receipt guards in 3.8 Flow hygiene, keeping them separate from Smart Sending and trigger re-entry. A requested restock alert can take priority over a general promotion; adjust the campaign audience instead of casually adding filters to the documented restock build. Test both arrival orders when two events happen close together.
For each eligible cohort, record delivered recipients, same-product buyers within a declared follow-up window, net sales after refunds and contribution after discounts and variable costs. Count each buyer once. Keep restock request-to-notification coverage and sold-out complaints alongside conversion. For replenishment, compare equally observed cohorts or a randomised no-reminder group if volume permits. Attributed revenue alone cannot show additional demand. Review unsubscribes and duplicate-message complaints for every flow.
For back in stock, test one subscribed variant staying queued while unavailable, releasing only under the recorded inventory and batch settings, and linking to that same available variant. Confirm the requested alert does not grant unrelated marketing permission. For price drop, test a qualifying catalogue price reduction and a nonqualifying reduction, plus a prior purchaser, unavailable variant and destination price. Record expected and observed results for each enabled flow. 4, 5
Replenishment build
Changes
Version 1.1, 18 September 2026: Clarified build or measurement guidance, source attribution and recommendation wording.
Sources
- How to create a replenishment flow · Klaviyo
Accessed
- How to create a date property-triggered flow · Klaviyo
Accessed
- Increase CLV with an AI repeat purchase flow · Klaviyo
Accessed
- How to build a back in stock flow · Klaviyo
Accessed
- How to create a price drop flow · Klaviyo
Accessed
Your progress
Done when: You have a documented build or skip decision for each flow. For each enabled flow, save its schedule where needed, product and purchase tests, truthful customer promise and measurement sheet with an owner and review date. A documented all-skip decision is complete when its reasons and reconsideration conditions are recorded; skipped flows do not require build tests or schedules.
Saves automatically in this browser.